Access road to the construction of a wind farm

TASK

Building a wind farm brings many challenges. One of them is transporting windmill elements. The investor was looking for a quick and practical way to harden the surface leading directly to the construction site, which is far away from the communication infrastructure.

SOLUTION

The use of ROAD SYSTEM boards was an ideal solution in this situation. Compared to traditional methods of building temporary access roads, which are not only time-consuming and costly, ROAD SYSTEM boards gain the advantage that they can be used many times. Assembly and disassembly is very easy, and no special equipment is needed for transport and unloading.

RESULT

The temporary access road and the storage site for the components for the construction of the wind farm were completed in a short time. Thanks to the use of road slabs, made of 100% recycled material, the entire investment is doubly ecological.

USED PRODUCTS

ROAD SYSTEM 200

Choose your geoPRODUCT

Go to online shop and place an order or download our catalog to get familiar with our offer. Contact us and get an offer tailored to your needs.

Store

Ważne: Strona wykorzystuje pliki cookies. W ramach naszej witryny stosujemy pliki cookies w celu świadczenia Państwu usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Państwa urządzeniu końcowym. Możecie Państwo dokonać w każdym czasie zmiany ustawień dotyczących cookies.