Temporary emergency access road

Task

A power plant experienced a breakdown that required immediate repair. Unfortunately, the weather conditions were unfavorable – wet and rather soft ground made it impossible for heavy equipment to access the site.

Solution

 The specialists decided to build a temporary road using ROAD SYSTEM 200 plates. These plates are lightweight and easy to assemble, which allows for quick creation of a stable surface.

Result

Laying the temporary road made it easier for heavy equipment to reach the breakdown site. Thanks to this, the failure was quickly eliminated and the power plant could resume normal operation. However, in case of more demanding ground conditions, ROAD SYSTEM 400 plates may be a better solution. They are heavier and more durable, which makes them ideal for heavy-duty applications.