Temporary road for housing estate construction
Task
The construction of the housing estate on Lechicka Street in Poznań required the creation of a temporary road 4.8 meters wide that could withstand construction vehicle traffic throughout the project’s duration. The goal was to lay the road quickly and efficiently without using a crane.
Solution
Seventy ROAD SYSTEM 400 plates were used, connected with RSL Line connectors. These plates are easy to install and durable, ensuring a fast road construction process without the need for heavy equipment.
Result
The road was laid within 3 hours, and its width of 4.8 meters ensures comfortable movement for construction vehicles. ROAD SYSTEM 400 plates endure heavy traffic and are resistant to damage, guaranteeing the road’s long lifespan.
Materials Used
Watch the video: