Dublin Car Park
TASK
Temporary set up of roads and a car park in Dublin, Ireland.
SOLUTION
For the duration of factory construction works a temporary car park for employees has been made. The car park and coach access roads have been reinforced with geoSYSTEM G4 grid and filled with aggregate.
RESULT
The surface is stabilised, reinforced and even. After two years, when the project is finished, the overlay is going to be disassembled and new surface will be laid. 11 400 square meters of geoSYSTEM G4 grid have been paved.
USED PRODUCTS
SEE VIDEO This video presents a step by step implementation of a gravel car park in a different location. You can see the entire process, starting with the substructure preparation and finishing with geoSYSTEM G4 grid laying. Location: Triangel – Culture and Conference Center. St. Vith, Belgium.