Fire road on the Warta River
TASK
The creation of pedestrian and bicycle routes along the river bank resulted in the creation of social meeting places. The Old Port was opened at the Chrobry Bridge. A solution was sought to strengthen the area for the fire road, which at the same time would be in harmony with the green surroundings.
SOLUTION
The access to the atmospheric marina is hardened with a geoSYSTEM G5 max grid, which will also allow the passage of fire engines. Strengthening the surface to 450 tons / sqm met the requirements for this type of road.
RESULT
The remarkably designed space of the Old Port, unique decorations and the proximity of recreational areas encourage you to visit this place. The surface made of eco-grilles blends in with the surroundings and gives it a natural character.
USED PRODUCTS